You are here : Home > News
Two drilling teams of GWDC realize annual drilling footage over 110,000m
Author:gwdc - PostTime:2011-12-20 16:50:38 - Hits:3074

In 2011, the GWDC 32806 drilling team reached a 113,000m drilling footage within a drilling time of 247 days, and the GWDC 32907 drilling team reached a 112,000m drilling footage within a drilling time of 251 days in the same block. These 2 teams exceeded the annual drilling footage record of 105,000m made by GWDC 32806 drilling team in 2010, breaking the footage record by 2 teams together for the first time. This year, the GWDC 32806 drilling team drilled 45 wells, with a drilling success ratio of 100%, reaching an accumulated drilling footage of 113,124m. The drilling footage has been over 100,000m in the past 3 years. Accelerated by the 32806 team and the 32097 drilling team continuously improved the operating efficiency, drilling 45 wells in 2011, with a drilling success ratio of 100% and an accumulated drilling footage of 102,020m.